    Developing a Stochastic Model to Predict Cost Overrun due to the Causes of Projects Delay in Oil Fields Construction Industry

    View/Open
    2016132116.pdf (9.025Mb)
    Date
    2020-05
    Author
    ALKHOORI, KHALID ABDUL MAJEED
    Metadata
    Show full item record
    Abstract
    The criticality of managing projects delay in oil fields construction projects has been exacerbated by the general complexities associated with the sources of projects delay and how varied the impact may be to various stakeholders such as client/owner, contractor, design/consultant and miscellaneous/external groups within the industry. While most of the previous research investigated the causes of project delay in general construction, very little research exists specifically on oil fields construction projects in terms of budget overrun. The main aim of the research is to establish a model that could be used to map the causes of projects delay to the cost overrun in oil fields construction projects and to investigate the variables that contribute to budget/cost overrun. In addition, the author used regression analysis and Monte Carlo simulation to develop a stochastic model to map the causes of projects delay to cost overrun. The research results revealed that poor contractor works was found to have the most significant positive impact in the delay experienced by the projects considered in this work. However, most of the causes of cost overrun were found to follow the Log logistic distribution – a family of distribution associated with projects where the risk increases at the initial phase of the project and decreases later on. Therefore, to minimize cost overrun, the study suggest that those involved in a project’s value chain must ensure a smooth execution of project in its early stage so as to limit the high risk associated with the project during in its initial phase. The main contribution of this work, is the research framework which can be used by businesses in oil fields construction industry to model their own factors and help in their decision-making, as opposed to using anecdotal evidence. Finally, the author recommended some areas of the current study that can be developed such as mapping the causes of projects delay to other impacts, such as time overrun success criteria and to increase the number of projects delay in the regression model.
    URI
    https://bspace.buid.ac.ae/handle/1234/1857
    Collections
    • Theses for Project Management

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Advanced Search

    BSpace Links

    Repository guidelinesFAQsContact Us

    Browse

    All of BSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV