From interactive control to IT project performance: examining the mediating role of stakeholder analysis effectiveness

dc.contributor.authorAsad Mir, Farzana
dc.contributor.authorRezania, Davar
dc.date.accessioned2026-01-22T09:47:02Z
dc.date.issued2022
dc.description.abstractPurpose–Thispaperaimstounpacktherelationshipbetweentheinteractiveuseof project control systems (PCS) and project performance by examining the role of stakeholder analysis effectiveness in enacting this relationship. A conceptual framework was developed based on the stakeholder theory and the levers of control framework. Design/methodology/approach– Partial least square-structural equation modelling analysis was conducted onthecross-sectional questionnaire data collected from 109 information technology (IT) projects. Findings– The interactive use of PCS enables project managers to effectively deal with the stakeholders related uncertainty, and stakeholder analysis effectiveness partially mediates the positive relationship between theinteractive use of PCSandIT projectperformance. Originality/value– This study extends the project control literature by explaining the positive relationship between the interactive use of PCS and project performance. The findings contribute to the stakeholder analysis literature by operationalizing the stakeholder analysis effectiveness construct and identifying it as a new mediator between theinteractive useof PCSandproject performance. Keywords Stakeholder analysis, Uncertainty, Project control systems, Interactive use, Project performance, Levers of control PapertypeResearch paper
dc.identifier.urihttps://bspace.buid.ac.ae/handle/1234/3677
dc.language.isoen_US
dc.titleFrom interactive control to IT project performance: examining the mediating role of stakeholder analysis effectiveness
dc.typeArticle

Files

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.35 KB
Format:
Item-specific license agreed upon to submission
Description: