From interactive control to IT project performance: examining the mediating role of stakeholder analysis effectiveness
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Purpose–Thispaperaimstounpacktherelationshipbetweentheinteractiveuseof project control systems
(PCS) and project performance by examining the role of stakeholder analysis effectiveness in enacting this
relationship. A conceptual framework was developed based on the stakeholder theory and the levers of
control framework.
Design/methodology/approach– Partial least square-structural equation modelling analysis was
conducted onthecross-sectional questionnaire data collected from 109 information technology (IT) projects.
Findings– The interactive use of PCS enables project managers to effectively deal with the stakeholders
related uncertainty, and stakeholder analysis effectiveness partially mediates the positive relationship
between theinteractive use of PCSandIT projectperformance.
Originality/value– This study extends the project control literature by explaining the positive
relationship between the interactive use of PCS and project performance. The findings contribute to the
stakeholder analysis literature by operationalizing the stakeholder analysis effectiveness construct and
identifying it as a new mediator between theinteractive useof PCSandproject performance.
Keywords Stakeholder analysis, Uncertainty, Project control systems, Interactive use,
Project performance, Levers of control
PapertypeResearch paper