The Role of Risk Allocation in Minimizing Disputes in Construction Contracts

dc.Location2014 HD 69.P75 O38
dc.SupervisorDr Arun Bajracharya
dc.contributor.authorOdunusi, Ganiyu Olawale
dc.date.accessioned2014-06-10T07:15:33Z
dc.date.available2014-06-10T07:15:33Z
dc.date.issued2014-01
dc.descriptionDISSERTATION WITH DISTINCTION
dc.description.abstractAn increase in the litigation cases resulting from the outbreak of mismanagement in construction contracts has prompted the need to examine the cause of disputes in construction projects. This research study delved into this issue by examining the role of risk allocation to minimize disputes in construction contracts via litigated cases that are analyzed using the concept of transaction cost economics theory. By so doing, the researcher sourced for three related cases from different legal portal archives and examined the causes that led to the case being a litigation case. The three litigation cases were examined using qualitative content analysis methodology. The analysis led to the three tier categories that were identified as the causes of disputes in the cases. The clients related causes involved the approach to project management, communication problems, errors in design, and contracting details, while contractors related causes included contracting details, approach to project management, development of bid, and communication problems. Subsequently, the risks across the cases were identified as concurrent delay and differing site conditions. The findings of the litigation cases were used to consolidate the proposition of the study. In this study, the contractors were seen to be held responsible for most of the risks within the project contract, which was as a result of misinterpretation/misrepresentation of contract agreement, acting on an implied contract and promises. It was concluded that the construction contracts can serve as a medium through which the contractual parties can co-exist and operate within a cooperative environment. Thereafter, recommendations were proffered on the need to properly allocate project risk accordingly to the party that can best handle the risk with the lowest transaction cost involvement.en_US
dc.identifier.other120030
dc.identifier.urihttp://bspace.buid.ac.ae/handle/1234/629
dc.language.isoenen_US
dc.publisherThe British University in Dubai (BUiD)en_US
dc.subjectrisk allocationen_US
dc.subjecttransaction cost economicsen_US
dc.subjectconstruction contractsen_US
dc.titleThe Role of Risk Allocation in Minimizing Disputes in Construction Contractsen_US
dc.typeDissertationen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
120030.pdf
Size:
2.9 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: